Application Scenarios
Areas without grid power or with weak power grids, such as mines, mountainous regions, and construction sites. These areas are characterized by the impracticality or high cost of installing charging piles. Therefore, mobile charging vehicles are a more suitable solution for providing DC fast charging to electric construction vehicles/machinery in the work area.
Strong Economic Advantages
This solution saves on grid construction costs in the work area. The mobile charging vehicle directly provides fast charging to construction vehicles on-site (e.g., in mines), significantly reducing infrastructure investment.
Flexible Product Transport
The containerized design allows for flexible transport. Enables rapid relocation. After use at one site, it can be easily transported to the next location for deployment.
Safety Features
. The product is equipped with a 320kW dual-gun integrated charging pile, meeting the DC fast-charging needs (less than 2 hours) of most domestic construction vehicles/machinery.
. The product itself supports both AC charging and DC fast charging, offering flexible charging options. For DC fast charging, up to six simultaneous charging guns can be customized.
Strong Adaptability
Mobile charging vehicles are available in two battery capacity options: 1306 kWh and 2090 kWh. These options cater to the fast-charging needs of small and medium-sized electric construction vehides/machinery and medium and large-sized electric construction vehides/machinery, respectively.